Changzhou seek Bridge Primary School (Metro Campus clock tower) substation high and low voltage cabinet procurement Q supplementary announcement

Updated: May 23, 2016  Views: 275

ID: UDIC mining public -2,016,011

Changzhou hereby seek Bridge Primary School (Metro Campus clock tower substation high and low voltage cabinet procurement tender documents to make the following clarifications Q:

1. Will the transformer low voltage cabinet to the bus bridge connection between the need to offer? Be answered, thank you!

Reply: Quote, after detailed list of changes.

Bidding Documents P15 Article: low voltage switch cabinet main components provide the recommended brand, will have to choose recommended brands or directly by drawing design brand offer??

Reply: The drawings have been Changzhou City Power Supply Bureau approval, the proposed configuration by drawing brand requirements.

3, the tender documents P7: quote needs to include 30,000 yuan design fees, paid by the successful bidder to design units, may I ask whether this design fees include 17% VAT (ie design units opened 30,000 yuan VAT invoice?

Reply: design units a VAT invoice is 6%, open to the successful tenderer the successful bidder to purchase units should be invoiced for the total price of the bid amount of votes, the procurement unit block does not subsidize this tax.

4, this item number: the 'City Investment adopt public -2,016,011' tender drawings, sub-cabinets and mother of total cabinet adopts frame breaker C9A-1000 800A / 3P, and verified by our company, C9A-1000 800A / 3P the framework for the economic circuit breaker circuit breaker, small size, can be used for outgoing cabinet, saving space and cost, but because the small size can not be installed three two lock keys, I recommend replacing C9A-2000 800A / 3P (can be installed two three lock-key). Please confirm!

Reply: In order to meet the functional requirements, two cabinet with Total: (C9A-2000A In = 800A / 3P Ir = 800A, S-type controllers, undervoltage delay 3s, ground fault protection, external transformer neutral level, sub-cabinet use: (C9A-2000A In = 800A / 3P Ir = 800A, S type controller, three drawer-type circuit breaker must be configured three lock two keys.

5, Friendly reminder: the drawings have been Changzhou City Power Supply Bureau approval, the proposed configuration by drawing, on the one hand there is conducive to fair competition when bidding units, on the other hand to prevent the influence of power supply bureau acceptance in the implementation process.

6, after the change the quotation list:

7, the rest of the original tender documentation requirements implemented.

Changzhou City Investment Construction Engineering Tendering Co., Ltd. May 23, 2016

No.

project name

Models and Specifications

unit

Quantity

unit price

Total price

Lead

Remark

(RMB

(RMB

10KV counters in the home

1

10kV line counters

KYN28-12

station

2

2

10kV metering cabinet

KYN28-12

station

2

3

10kV sub-cabinet

KYN28-12

station

1

4

10kV outgoing cabinet

KYN28-12

station

2

5

10kVPT, arrester cabinet

KYN28-12

station

1

0.4kV low-voltage withdrawable switchgear

1

0.4kV times total cabinet

MNS

station

2

2

0.4kV reactive power compensation cabinet

SVC

station

2

3

0.4kV segment cabinet

MNS

station

1

4

0.4kV outgoing cabinet

MNS

station

6

5

0.4kV bus bridge between the cabinet

3 * TMY-60 * 6 + TMY-50 * 5

Equipment

1

6

Transformers - low voltage bus

3 * TMY-60 * 6 + TMY-50 * 5

set

2

7

Signal box

only

1

8

DC panel

20Ah / DC110V

station

1

other

1

Special Tools fee

Meet the needs of the warranty period

2

Random spare parts costs

3

Test and debug special spare parts

4

design fee

item

1

30,000

30,000

...

......

The total price of the project


www.get-top-news.com Get Top News, Latest News and Current News from get-top-news.com. Latest Current News: U.S., China, World, Entertainment, Health, Finance, Business, echnology, Travel, Politics, Sports.

Traditional Chinese: 常州市覓渡橋小學(鐘樓新城分校)變電所高低壓櫃采購項目答疑補充公告